District Wide | |
New scoreboard Ferguson | $9,800.00 |
Replace mower | $12,021.00 |
Roof repair BOE | $13,062.00 |
Café. tables Hook | $15,634.00 |
New steamer | $16,070.00 |
Food service vehicle repairs | $18,707.53 |
Build pole barn | $20,395.00 |
Asphalt repair | $24,990.02 |
Band instruments | $27,000.00 |
Upgrade phone system | $48,777.00 |
Classroom furniture | $54,444.00 |
Replace roofs at Hook, Heywood, and Concord | $126,576.00 |
Make BOE handicap accessible | $191,955.00 |
Purchase computer hardware | $250,000.00 |
Troy High School | |
Replace water heater | $12,801.00 |
Repair asphalt | $15,120.00 |
Replace plumbing | $17,955.00 |
Remodel MH classroom | $18,194.00 |
Restroom repair | $18,234.00 |
Science room renovations | $18,990.35 |
Replace exterior ductwork | $20,000.00 |
Replace plumbing | $20,056.00 |
Purchase Acoustical shell | $21,071.00 |
Purchase band instruments | $21,231.00 |
Purchase Acoustical shell | $21,071.00 |
Glaze windows | $22,000.00 |
Re-caulk windows | $22,206.00 |
Paint first floor hallway | $24,999.00 |
Replace water lines | $25,000.00 |
Purchase band instruments | $26,910.00 |
Purchase band instruments | $32,200.00 |
Purchase Science equipment | $39,390.84 |
Purchase computer hardware | $41,273.00 |
Replace NE section of roof | $249,775.00 |
Renovate the auditorium | $342,904.00 |
Troy Junior High | |
Asphalt repair | $1,932.00 |
Intercom system | $3,421.00 |
Gym floor protective covering | $6,257.00 |
Concrete work | $6,297.00 |
Replace lintels | $7,500.00 |
Install new lights gym | $9,900.00 |
Crackfill and seal south lot | $11,000.00 |
Replace sidewalk and curb | $14,500.00 |
Roof repair | $14,806.00 |
Paint hallways | $14,825.00 |
Replace sidewalk | $16,648.00 |
Upgrade electrical IMC | $16,900.00 |
Repair and resurface gym floor | $19,826.00 |
Replace plumbing | $22,050.00 |
Painting classrooms | $24,975.00 |
Partial roof replacement | $143,926.00 |
Concord | |
Custodial mop sink replace | $1,983.00 |
Intercom system | $2,696.00 |
Replace lintels | $6,000.00 |
Add Computer lab | $6,632.40 |
Tuck Pointing | $7,500.00 |
Seal asphalt | $7,817.00 |
Asphalt Basketball Court | $9,390.00 |
Repair pavement | $10,947.00 |
Install Drains in basement | $11,500.00 |
Sidewalk replacement | $15,000.00 |
Purchase computer hardware | $18,464.00 |
Masonry repair | $20,308.00 |
Renovate classrooms | $23,053.00 |
Relocate electrical service | $23,125.00 |
Roof repair | $37,291.00 |
Interior painting | $50,000.00 |
Partial roof replacement | $245,125.00 |
Cookson | |
Exterior lighting | $1,040.00 |
Replace playground equipment | $5,774.00 |
Crack fill asphalt | $5,917.00 |
Replace restroom partitions | $6,000.00 |
Electrical work | $6,954.00 |
Replace sidewalks | $8,580.00 |
Repair restroom | $12,347.00 |
Tuck pointing | $15,464.00 |
Window and door caulking | $22,000.00 |
Paint hallways | $22,553.00 |
Renovate interior | $61,685.00 |
Renovate interior | $437,741.00 |
Roof replacement | $624,708.00 |
Forest | |
Post-Renovation Projects (2007- ) | |
Pave Playground | $25,000.00 |
Caulking | $3,500.00 |
Install security system | $4,058.00 |
Replace water heater | $4,313.00 |
Heywood | |
Repair exterior wall of gym | $4,761.00 |
Construct surface drain | $4,785.00 |
Water softener | $5,000.00 |
Clean limestone-Ridge Ave. | $5,500.00 |
Paint office and gym | $6,350.00 |
Sidewalk work | $6,970.00 |
Paint hallways | $7,300.00 |
POS system | $9,495.00 |
Repair parking lot | $10,146.00 |
Purchase computer hardware | $10,725.00 |
Paint classrooms | $14,965.00 |
Replace clock system | $15,559.00 |
Repair gym floor | $33,850.00 |
Hook | |
Intercom system | $3,100.00 |
Sidewalk work | $4,500.00 |
Refinish gym floor | $6,000.00 |
Replace sidewalks | $7,067.00 |
Install security system | $7,221.00 |
POS system | $9,494.00 |
Replace interior lighting | $20,050.00 |
Restroom repair | $21,240.00 |
Replace interior lighting | $22,698.00 |
Roof replacement | $32,568.00 |
Roof replacement | $37,500.00 |
Roof replacement | $61,000.00 |
Abate asbestos | $120,799.00 |
Kyle | |
Replace brick | $1,700.00 |
Replace stage curtains | $3,291.00 |
Replace retaining wall | $3,943.00 |
Install interior doors | $5,023.00 |
Repair walks | $6,000.00 |
Install security equipment | $7,221.00 |
POS system | $9,494.00 |
Replace cove base in gym | $11,000.00 |
Install new electric service | $12,836.00 |
Replace ceiling tile | $13,138.00 |
Repair old plumbing | $13,642.90 |
Electrical upgrade | $15,033.00 |
Repair front walls | $15,175.00 |
Interior painting | $22,000.00 |
Abate asbestos | $23,819.00 |
Install new electrical service | $40,352.00 |
Van Cleve | |
Repair asphalt | $1,412.00 |
Waterproof exterior walls | $1,643.00 |
Repair exterior walls | $2,437.27 |
Intercom system | $3,236.00 |
Replace storage room door | $4,050.00 |
Repair/replace sidewalks | $4,128.00 |
Waterproof ext. walls | $4,482.00 |
Caulk around windows | $10,000.00 |
Repair wall in gym | $11,278.00 |
Tuck pointing | $18,050.00 |
Renovate restrooms | $19,023.00 |
Interior painting | $20,000.00 |
Tuck pointing and masonry work | $24,000.00 |
Tuck pointing and painting | $24,652.00 |
Tuck pointing and masonry work | $25,000.00 |
Replace water lines | $25,000.00 |
Replace roof on SE section | $174,233.00 |
Troy Memorial Stadium | |
Roll down doors | $13,800.00 |
Install fire suppression system | $20,115.00 |
Replace seating | $43,529.00 |
Resurface Track | $62,700.00 |
Paint deck | $75,500.00 |