Below is a list of all Permanent Improvement projects the district has completed from FY2005-FY2013.
You can jump to a specific section by clicking on a link below.
FY2005-FY2013 |
|
|
|
District Wide |
|
New scoreboard Ferguson |
$9,800.00 |
Replace mower |
$12,021.00 |
Roof repair BOE |
$13,062.00 |
Café. tables Hook |
$15,634.00 |
New steamer |
$16,070.00 |
Food service vehicle repairs |
$18,707.53 |
Build pole barn |
$20,395.00 |
Asphalt repair |
$24,990.02 |
Band instruments |
$27,000.00 |
Upgrade phone system |
$48,777.00 |
Classroom furniture |
$54,444.00 |
Replace roofs at Hook, Heywood, and Concord |
$126,576.00 |
Make BOE handicap accessible |
$191,955.00 |
Purchase computer hardware |
$250,000.00 |
|
|
Troy High School |
|
Replace water heater |
$12,801.00 |
Repair asphalt |
$15,120.00 |
Replace plumbing |
$17,955.00 |
Remodel MH classroom |
$18,194.00 |
Restroom repair |
$18,234.00 |
Science room renovations |
$18,990.35 |
Replace exterior ductwork |
$20,000.00 |
Replace plumbing |
$20,056.00 |
Purchase Acoustical shell |
$21,071.00 |
Purchase band instruments |
$21,231.00 |
Purchase Acoustical shell |
$21,071.00 |
Glaze windows |
$22,000.00 |
Re-caulk windows |
$22,206.00 |
Paint first floor hallway |
$24,999.00 |
Replace water lines |
$25,000.00 |
Purchase band instruments |
$26,910.00 |
Purchase band instruments |
$32,200.00 |
Purchase Science equipment |
$39,390.84 |
Purchase computer hardware |
$41,273.00 |
Replace NE section of roof |
$249,775.00 |
Renovate the auditorium |
$342,904.00 |
|
|
Troy Junior High |
|
Asphalt repair |
$1,932.00 |
Intercom system |
$3,421.00 |
Gym floor protective covering |
$6,257.00 |
Concrete work |
$6,297.00 |
Replace lintels |
$7,500.00 |
Install new lights gym |
$9,900.00 |
Crackfill and seal south lot |
$11,000.00 |
Replace sidewalk and curb |
$14,500.00 |
Roof repair |
$14,806.00 |
Paint hallways |
$14,825.00 |
Replace sidewalk |
$16,648.00 |
Upgrade electrical IMC |
$16,900.00 |
Repair and resurface gym floor |
$19,826.00 |
Replace plumbing |
$22,050.00 |
Painting classrooms |
$24,975.00 |
Partial roof replacement |
$143,926.00 |
|
|
Concord |
|
Custodial mop sink replace |
$1,983.00 |
Intercom system |
$2,696.00 |
Replace lintels |
$6,000.00 |
Add Computer lab |
$6,632.40 |
Tuck Pointing |
$7,500.00 |
Seal asphalt |
$7,817.00 |
Asphalt Basketball Court |
$9,390.00 |
Repair pavement |
$10,947.00 |
Install Drains in basement |
$11,500.00 |
Sidewalk replacement |
$15,000.00 |
Purchase computer hardware |
$18,464.00 |
Masonry repair |
$20,308.00 |
Renovate classrooms |
$23,053.00 |
Relocate electrical service |
$23,125.00 |
Roof repair |
$37,291.00 |
Interior painting |
$50,000.00 |
Partial roof replacement |
$245,125.00 |
|
|
Cookson |
|
Exterior lighting |
$1,040.00 |
Replace playground equipment |
$5,774.00 |
Crack fill asphalt |
$5,917.00 |
Replace restroom partitions |
$6,000.00 |
Electrical work |
$6,954.00 |
Replace sidewalks |
$8,580.00 |
Repair restroom |
$12,347.00 |
Tuck pointing |
$15,464.00 |
Window and door caulking |
$22,000.00 |
Paint hallways |
$22,553.00 |
Renovate interior |
$61,685.00 |
Renovate interior |
$437,741.00 |
Roof replacement |
$624,708.00 |
|
|
Forest |
|
Post-Renovation Projects (2007- ) |
|
Pave Playground |
$25,000.00 |
Caulking |
$3,500.00 |
Install security system |
$4,058.00 |
Replace water heater |
$4,313.00 |
|
|
Heywood |
|
Repair exterior wall of gym |
$4,761.00 |
Construct surface drain |
$4,785.00 |
Water softener |
$5,000.00 |
Clean limestone-Ridge Ave. |
$5,500.00 |
Paint office and gym |
$6,350.00 |
Sidewalk work |
$6,970.00 |
Paint hallways |
$7,300.00 |
POS system |
$9,495.00 |
Repair parking lot |
$10,146.00 |
Purchase computer hardware |
$10,725.00 |
Paint classrooms |
$14,965.00 |
Replace clock system |
$15,559.00 |
Repair gym floor |
$33,850.00 |
|
|
Hook |
|
Intercom system |
$3,100.00 |
Sidewalk work |
$4,500.00 |
Refinish gym floor |
$6,000.00 |
Replace sidewalks |
$7,067.00 |
Install security system |
$7,221.00 |
POS system |
$9,494.00 |
Replace interior lighting |
$20,050.00 |
Restroom repair |
$21,240.00 |
Replace interior lighting |
$22,698.00 |
Roof replacement |
$32,568.00 |
Roof replacement |
$37,500.00 |
Roof replacement |
$61,000.00 |
Abate asbestos |
$120,799.00 |
|
|
Kyle |
|
Replace brick |
$1,700.00 |
Replace stage curtains |
$3,291.00 |
Replace retaining wall |
$3,943.00 |
Install interior doors |
$5,023.00 |
Repair walks |
$6,000.00 |
Install security equipment |
$7,221.00 |
POS system |
$9,494.00 |
Replace cove base in gym |
$11,000.00 |
Install new electric service |
$12,836.00 |
Replace ceiling tile |
$13,138.00 |
Repair old plumbing |
$13,642.90 |
Electrical upgrade |
$15,033.00 |
Repair front walls |
$15,175.00 |
Interior painting |
$22,000.00 |
Abate asbestos |
$23,819.00 |
Install new electrical service |
$40,352.00 |
|
|
Van Cleve |
|
Repair asphalt |
$1,412.00 |
Waterproof exterior walls |
$1,643.00 |
Repair exterior walls |
$2,437.27 |
Intercom system |
$3,236.00 |
Replace storage room door |
$4,050.00 |
Repair/replace sidewalks |
$4,128.00 |
Waterproof ext. walls |
$4,482.00 |
Caulk around windows |
$10,000.00 |
Repair wall in gym |
$11,278.00 |
Tuck pointing |
$18,050.00 |
Renovate restrooms |
$19,023.00 |
Interior painting |
$20,000.00 |
Tuck pointing and masonry work |
$24,000.00 |
Tuck pointing and painting |
$24,652.00 |
Tuck pointing and masonry work |
$25,000.00 |
Replace water lines |
$25,000.00 |
Replace roof on SE section |
$174,233.00 |
|
|
Troy Memorial Stadium |
|
Roll down doors |
$13,800.00 |
Install fire suppression system |
$20,115.00 |
Replace seating |
$43,529.00 |
Resurface Track |
$62,700.00 |
Paint deck |
$75,500.00 |